Transportation of the first Wind Turbine in the Kingdom,2016
![heavy](https://ghhl.net/wp-content/uploads/2015/12/30.jpg)
![heavy](https://ghhl.net/wp-content/uploads/2015/12/31.jpg)
![heavy](https://ghhl.net/wp-content/uploads/2015/12/32.jpg)
![heavy](https://ghhl.net/wp-content/uploads/2015/12/33.jpg)
![heavy](https://ghhl.net/wp-content/uploads/2015/12/34.jpg)
GHHL transported a 58.7 meter long wind-turbine blade at Saudi Aramco’s headquarters.
Senior management from Saudi Aramco and General Electric (GE) gathered on Dec 13’16 to sign their names to the 13-ton blade, which was briefly put on display before beginning its 8- to 10-day journey to the northern Saudi city of Turaif.